Who should install this unit
Preparation
Installation-General RequirementsChapter ThreeThe SP PRO must only be insta
Environmental Considerations
Preparation
1 -
3
8
Installation of SPLC models1 -
5
10
Battery Cabling Requirements
DC Wiring SPMC Models
Expansion Card Warning - 120VDC modelSPMC1201, SPLC1200 and SPLC1202 models
Battery Wiring (DC) Preparation
AC Wiring
AC Wiring Preparation
Backup Generator (Advanced Feature) Control Wiring
Chapter FourInstallation-System Configuration
Managed AC Coupled Preparation
Line diagram for single phase managed AC coupling
Minimum Battery sizes for Managed AC coupling
Generic AC Couple
Three Phase Preparation
DC couple Charge Controller Preparation
Installation-Ancillary ComponentsChapter FiveInputs and Output
Setting name Function
External AC Source contactor
INTRODUCTION
Adding a backup Generator (Solar Hybrid)
Adding a Generator (Off Grid)
Chapter SixCommunications Overview
RS232 serial communications
Pin
SP PRO Ethernet AdaptorConnecting to a LAN
Installation-Configure with SP LINKChapter SevenOverview
Conguring The SP PRO For All System Congurations
Installation-CommissioningChapter EightIntroduction
Common System Checks
Item to check Result
Checking Managed AC coupled systems
Checking Generic AC coupled
Three phase and Split Phase Systems
External AC Source Contactor
External Generator
Chapter Nine User Interface
4
SP PRO OperationChapter Ten
Battery Management
Australian/New Zealand Warranty
Battery Charging Operation
Bulk Voltage Absorption Voltage Float Voltage Equalise Voltage
Battery Temperature Compensation
Generator Controls for Off Grid
Service and MaintenanceChapter ElevenCleaning the Fan and Fan lter
Resetting inverter with or without Restoring Factory Default settings
TroubleshootingChapter Twelve
1.Alarm Silence button
Troubleshooting with SP LINK
AC Power Problems
Included in this package
Off Grid Generator Start/Stop Problems
Inverter Startup Problems
Appendix A SpecificationsAppendixProduct Specications
Kommentare zu diesen Handbüchern